Scope. New medium-voltage switchgear, transformers and low-voltage distribution for an expanded production line, plus 2 MVA of standby generation — for a confidential industrial manufacturer.
Delivery. Long-lead transformers and switchgear were sequenced first, with factory inspections before shipment. Site work was staged around the production schedule so operations continued through the upgrade.
Outcome. The system was energized in stages, protection settings were tested and documented at each step, and the plant was handed over with as-built documentation.